Home Seawalls & Shoreline
Repair · Replacement · Erosion Control · Riprap

Seawall Repair & Shoreline Stabilization.

Engineered seawall, bulkhead, and shoreline systems for Southwest Florida waterfronts.

Seawalls & Shoreline
Capabilities

What we deliver inside this scope.

01

Seawall Repair & Replacement

New seawall construction, panel replacement, cap repair, and tieback restoration along residential, commercial, and municipal waterfront. Built to 2023 Florida Building Code and ASCE 7-22 standards. 316 stainless hardware throughout.

02

Bulkheads & Revetments

Structural bulkheads, vinyl sheet pile systems, and rock revetments engineered for storm exposure and tidal loading.

03

Riprap & Shoreline Restoration

Riprap installation, sand-cement riprap bag systems, shoreline restoration, and erosion control. Geotextile reinforcement and engineered fill.

04

Hurricane Damage Recovery

Rapid response to hurricane and storm-driven shoreline failure — temporary stabilization through permanent reconstruction.

05

Engineer-Driven Construction

Direct collaboration with licensed Florida engineers of record on plans-and-specs execution for complex municipal and private waterfront work.

Featured Capability

Helical Tiebacks & Helical Piers.

Engineered steel anchoring and deep foundation systems used to stabilize seawalls, docks, retaining walls, and waterfront structures across Southwest Florida.

View Helical Capabilities →
Resists
Movement · Settlement
Resists
Erosion · Storm Pressure
Used For
Seawalls · Bulkheads
Used For
Docks · Retaining Walls
Featured Program · Three Completed Sites

Sarasota County — Hurricane Damage Recovery Program.

Three different waterfront recovery scopes within one municipal program. Different problems, different engineering approaches, same execution standards.

Whitaker Gateway Park Pier reconstruction
COMPLETED

Whitaker Gateway Park Pier

Pier reconstruction
Pier63′-0″ × 9′-0″
Foundation12″ PSC piling
Embedment25′ min
Decking2x6 Trex Select
Nora Patterson Park finished seawall
COMPLETED

Nora Patterson Park

Seawall tieback & shoreline restoration
Shell Restoration~100 CY
RiprapSand-cement bag
Slab BackfillTremie concrete
Filter FabricReplaced
Cleveland Drive boardwalk completion
COMPLETED

Cleveland Drive (West End)

Boardwalk repair & gravity wall
Existing PilesReset & reused
Decking2x6 Trex Select
Vinyl Fence35 LF Type B
Gravity Wall23 LF Scheme 1
Region
Sarasota County
Program
Hurricane Damage Recovery
Standards
FBC 2023 · ASCE 7-22
Hardware
316 Stainless Throughout
Other Capabilities
Get In Touch

Ready to discuss
your project?

Tell us about the site, the scope, and the timeline. We'll tell you honestly whether we're the right contractor for the job.

Call Direct
(941) 254-1923
Office
2540 Coconut Drive
Sanibel, FL 33957